In Nocatee and Ponte Vedra Beach, two questions come before the design of any fire pit or fireplace. Where will the gas come from? And what does your neighborhood's review board need to see? Get either one wrong and the project stalls before anyone picks a stone.

This is the fifth post in Lit Before the Cold. Here's what Nocatee's gas service means for a fire feature, what local review boards say in their own documents, and what to have ready before you submit.

Quick Answer

What do I need to sort out before adding a gas fire pit or fireplace in Nocatee or Ponte Vedra Beach?

Two things: the fuel and your HOA's approval. Nocatee was planned as a natural gas community served by TECO, but confirm service at your own address with Peoples Gas at 877-832-6747 before you design around a gas line. Titan Outdoor Solutions says running a gas line or adding a propane tank is permitted work, while a plug-in infrared heater needs no permit. Nocatee's neighborhoods have their own associations and rules. In Crosswater's Freedom Landing, Heritage Trace and Liberty Cove, any improvement visible from a road or neighboring lot needs approval first, decisions come within 15 working days of a complete submittal, and propane tanks must be screened from the street. In Ponte Vedra Beach, Marsh Landing requires an Architectural Review Board application for every exterior modification, and an owner who applies for a county permit without the board's approval must swear the board received the application at least 30 days earlier. Get your community's current rules, a site plan, materials and your gas answer together first, and build the review time into your schedule.

Natural gas or propane

A gas fire feature runs on one of two fuels. Natural gas comes through a utility line, so it never runs out, but a line has to be run to the feature. Propane comes from a tank on your property that gets refilled, so it works where there's no gas service, but the tank has to sit somewhere.

Either way, Titan Outdoor Solutions says running a gas line or adding a propane tank is permitted work, so the permit belongs in the plan from day one. As the second post in this series covered, the alternative Titan often recommends, a plug-in infrared heater, needs no permit at all.

Nocatee: built as a natural gas community

Nocatee was planned around natural gas. Its developer, the PARC Group, wrote in 2013 that it had teamed with TECO Energy to supply natural gas to homes for water heaters and appliances. The same post noted that gas stoves and gas grills were already popular features in Nocatee homes and on their patios.

A developer's description isn't a service map. Before you design around a gas line, call Peoples Gas at 877-832-6747 (877-TECO-PGS) and confirm service at your address. If the house already has a gas meter, ask the installer whether the existing service can carry another appliance.

Nocatee: every neighborhood has its own book

Nocatee isn't one homeowners association. Its villages and neighborhoods have their own associations and their own manuals, and the rules for a fire feature can differ from one street to the next. Two published manuals show how much:

What two Nocatee neighborhood manuals say
Crosswater (Freedom Landing, Heritage Trace, Liberty Cove)River Landing
What needs approvalAny improvement visible from a road or a neighboring lot, before installationPatios, walls, walkways and anything visible from the road or neighbors, before permitting
How long review takesA decision within 15 working days of a complete submittalAims to respond within 20 business days
Propane tanksScreened from the street by landscaping tall enough to hide themKept in a service court behind a wall at least 4 feet 6 inches high
What to submitSubmittal form, site plan or photo or product specs, color samples, a written descriptionPlans with materials and colors; post-construction patios, walls and similar work carry a $500 review fee

River Landing's manual also covers fireplaces built onto the house. It accepts masonry or prefabricated fireboxes, wood or gas, and direct-vent or vent-free units, and says any fireplace extending beyond an exterior wall has to rise from the foundation, with no cantilevered chimneys. If your plan connects a fireplace to the house, read that section of your own manual closely.

In Nocatee and Ponte Vedra Beach, the first approval a fire feature needs usually isn't from the county. It's from your neighborhood.

Ponte Vedra Beach: one community's rules

Ponte Vedra Beach communities each set their own review rules. Marsh Landing is a clear example. Its Architectural Review Board requires an application for every exterior modification, down to like-for-like replacements and tree removals. It meets on the first and third Tuesday of each month, and its published 2026 calendar has one meeting left after this post: December 15, with a submittal deadline of December 4. Miss that and you're waiting on the 2027 calendar.

Marsh Landing also explains a St. Johns County rule most homeowners haven't heard of. Since 2010, the county has asked each association with architectural review to register as either a Registered Approval Association or a Registered Notice Association; the registry sits in Section 5.03.02.H of the county's Land Development Code. Marsh Landing chose notice in February 2011. Its ARB page explains what that means: an owner can apply to the county for a permit without ARB-approved plans, but the county then requires a sworn affidavit that the ARB received the same application at least 30 days earlier, proof it was delivered, a signed statement accepting the risk of civil liability if the work breaks the covenants, and an extra set of plans the county mails to the ARB. In other words, skipping the board doesn't skip the wait, and it adds legal risk. Apply to the board first.

We couldn't find current published rules for every Ponte Vedra Beach community, and they change. The county's Registered Architectural Review Associations map shows whether yours is on record; your association's office can tell you the rest.

What to have ready

Before you submit to your HOA
ItemWhy
Your neighborhood's current guidelinesRules differ between associations, even inside Nocatee
A site plan showing where the feature goesBoards look at placement and what neighbors and the street can see
Materials, finishes and colorsMost boards review how new work matches the house
Fuel: natural gas or propane, and where a tank would sitPropane tanks usually need screening, and the board will ask
Your answer from Peoples GasSettles natural gas or propane before you design
The board's review time and any notice period15 working days, 20 business days or a twice-monthly meeting deadline can sit ahead of the county permit

What about infrared?

A plug-in infrared heater skips the gas question entirely, and Titan says it needs no permit. It doesn't automatically skip the HOA. Crosswater's manual, for one, covers any improvement visible from a road or a neighboring lot, so a heater built into an open lanai wall may still need a submittal. Titan's Melanie Fraser says those units can be as thin as 4 to 12 inches, so ask your board early and include a product sheet.

The timing

HOA review adds weeks before the county permit even starts, and boards keep their own schedules. As the first post in this series showed, most of our cold nights fall between December and February, and the previous post covered the same calendar problem in St. Augustine's historic district. Start the HOA conversation now and a fire feature can still be lit for the coldest weeks.

Titan Outdoor Solutions builds gas fire pits, outdoor fireplaces and infrared heaters, and can help you put together what your review board will ask for.

Next, and last, in this series, on Monday: what each type of fire feature costs, and when to start so it's lit before the coldest weeks.

Frequently Asked Questions

Is natural gas available in Nocatee?

It was planned that way. Nocatee's developer, the PARC Group, wrote in 2013 that it had teamed with TECO Energy to make Nocatee a natural gas community, supplying homes for water heaters and appliances. A developer's description isn't a service map, so confirm service at your address with Peoples Gas at 877-832-6747 before you design around a gas line.

Does a propane tank for a fire pit need to be hidden in Nocatee?

Usually, yes. Crosswater's homeowner manual requires LP tanks to be screened from the street with landscaping tall enough to block them, and River Landing's manual puts LP tanks in a service court behind a wall at least 4 feet 6 inches high. Check your own neighborhood's guidelines for the exact rule.

Do Ponte Vedra Beach HOAs require approval for a fire pit?

Many do. Marsh Landing, for example, requires an Architectural Review Board application for all exterior modifications, including like-for-like replacements and tree removals. Rules vary by community, so ask yours before you design.

How long does HOA review take?

It varies. Crosswater's manual says decisions come within 15 working days of a complete submittal, River Landing's ARB aims for 20 business days, and Marsh Landing's board meets twice a month with deadlines about 11 days ahead, and an owner who goes to the county without its approval must show the board had the application at least 30 days. Add that time before the county permit.

Do I need a permit to run a gas line to a fire pit?

Titan Outdoor Solutions says gas line work and propane tank installation are permitted work, so plan on a permit from the county building department, pulled before the work starts. A plug-in infrared heater, by contrast, needs no permit, Titan says, though a new hardwired circuit is electrical work.

Sources

  1. Nocatee (The PARC Group). Nocatee: A Natural Gas Community. March 5, 2013. blog.nocatee.com
  2. Crosswater at Nocatee. Homeowner's Architectural Criteria and Review Procedure Manual (Freedom Landing, Heritage Trace, Liberty Cove). September 19, 2017. nocatee.com
  3. River Landing at Nocatee. Architectural Review Board Standards and Procedures Manual. March 2025 revision. nocatee.com
  4. Marsh Landing Master Association. Architectural Review (ARB), Registered Notice Association and 2026 meeting calendar. Accessed November 2026. marshlandinghoa.com
  5. St. Johns County GIS. Registered Architectural Review Associations (Land Development Code Section 5.03.02.H). Accessed November 2026. gis.sjcfl.us
  6. Titan Outdoor Solutions. Phone interview with Melanie Fraser, President, and William Davis, Vice President, on fire feature options and installation. November 5, 2026. titanoutdoorsolution.com
  7. Titan Outdoor Solutions. Outdoor Fireplaces and Fire Pits. Accessed November 2026. titanoutdoorsolution.com

Cover image: AI-generated illustration. It does not show a Titan Outdoor Solutions installation.

Titan Outdoor Solution

Titan Outdoor Solution

Titan Outdoor Solutions is an outdoor living company based in St. Augustine, Florida. Founded in 2017 in hurricane shutters and screens, Titan now designs and builds StruXure pergolas, Fenetex motorized screens, outdoor kitchens, outdoor fireplaces and fire pits, plunge pools and travertine hardscaping for homeowners across Northeast Florida. Titan Outdoor News shares what the team has learned about building outdoor spaces that work in this climate.

Instagram logo icon
Back to Blog
Planning a project like this?

Talk it through with a Titan designer

Book a free design consultation at your home or our St. Augustine showroom. Have a quick question first? Ellie, our AI assistant, can answer it right now.

Browse all outdoor living guides →

Your outdoor transformation starts with one conversation.

Showroom: 3515 Agricultural Center Dr, St. Augustine, FL 32092 · (904) 484-7580